Industry News

ISO/CIE 8995-1:2025: New Workplace Lighting Requirements

What the 2025 indoor workplace lighting standard means for illuminance, glare, colour quality, visual comfort and project documentation.

7 min readArtdon Lighting Team
White architectural track wall-washer with integrated driver, LED chips and high-efficiency optical lens

KEY TAKEAWAYS

  • Treat illuminance as one part of visual quality
  • Coordinate glare control with real viewing directions
  • Use verified photometric and colour data
  • Validate with measurement and user feedback

01A New Reference for Indoor Workplaces

ISO/CIE 8995-1:2025 is the current international reference for lighting indoor work places. It supports safe and effective visual tasks while addressing the quality of the luminous environment.

Because standards may be adopted differently by jurisdictions and certification systems, designers should check the licensed text and applicable local requirements before final specification.

02From Illuminance to Visual Quality

Workplace lighting is not defined by a single lux value. Task illuminance, surrounding brightness, uniformity, modelling, direction of light and user needs work together.

A compliant-looking calculation can still produce a flat or uncomfortable room if surfaces, screens and vertical brightness are ignored. Good design uses the standard as a baseline and tests the actual visual experience.

Industry Impact at a Glance

LEKO 60

01 Treat illuminance as one

Treat illuminance as one part of visual quality. This point should be documented and verified during project delivery.

LITE PRO 60

02 Coordinate glare control with

Coordinate glare control with real viewing directions. This point should be documented and verified during project delivery.

LITE PRO 50

03 Use verified photometric and

Use verified photometric and colour data. This point should be documented and verified during project delivery.

Optic Film

04 Validate with measurement and

Validate with measurement and user feedback. This point should be documented and verified during project delivery.

03Glare and Colour Performance

Glare control depends on luminaire optics, viewing direction, layout and room geometry. Colour quality also affects material recognition, skin tones and visual clarity, making source selection more than a wattage decision.

Products should be compared using verified photometric and colour data. Mock-ups are valuable where screens, glossy materials or long viewing distances create risk.

04How to Update Specifications

Update schedules to include maintained illuminance, uniformity, glare criteria, colour properties, controls and maintenance assumptions. Request photometric files and traceable performance data from suppliers.

Coordinate ceilings, furniture and workstations early so the lighting layout reflects actual tasks rather than an empty plan.

Project Planning Matrix

Project StagePriorityRecommended Action
ConceptDesign intentDefine performance goals and applicable standards
SpecificationEvidenceVerify product data, controls and interoperability
CommissioningReal performanceTest settings, document results and review after occupancy

05Applying the Standard Responsibly

Use the official standard for exact requirements and terminology. Document deviations, project-specific risks and the evidence used to validate the solution.

Post-installation measurements and occupant feedback close the gap between calculation and reality, especially in flexible offices and hybrid work settings.

Need help with your lighting project?

Architectural lighting consultation and technical support

CONTACT US →
Link copied